Agree material lists, wetted material grades and the required traceability documents for the supplied equipment.
Vessel inspection
The source package describes weld radiographic inspection, pressure testing, dimensional inspection and quality documentation. The final inspection plan is agreed per project.
Control acceptance
Verify the agreed I/O, valve sequence, alarms and interface behavior against a documented factory acceptance plan.
Destination requirements
Confirm applicable pressure-vessel and electrical requirements before ordering. Chinese documentation is not represented as automatic approval for every destination.
Equipment & control details.
Vessel fabricationStainless vessel fabrication photograph supplied by SINOSEN.Multiple-vessel productionOriginal workshop photograph of assembled pressure vessels.Generation 5 systemSINOSEN modular dual-vessel system visualization.Sequence controlSupplied HMI screen showing the vessel-transfer sequence.
START WITH THE DUTY
Your material. Your route.
Your transfer system.
Share your process conditions. SINOSEN will help define the vessel arrangement, controls and site interfaces.