Provide the safety data sheet and site classification. Evaluate chemical compatibility, vent destination, pressure protection and whether the product may contact compressed air. Hazardous duties require a separate design review.
Approve the duty, layout, piping connections, utilities, receiver arrangement and upstream/downstream permissives before fabrication.
Assemble & test at the factory
Check the agreed skid assembly, instruments, valve operation and control sequence against the factory acceptance plan.
Position & connect on site
Qualified local installers complete the foundation, product piping, power, compressed air, venting and agreed signal wiring.
Verify & release to production
Complete site safety checks, leak checks, interlock tests and product trials. Confirm the operating recipe with SINOSEN remote assistance or the agreed service scope.
START WITH THE DUTY
Your material. Your route.
Your transfer system.
Share your process conditions. SINOSEN will help define the vessel arrangement, controls and site interfaces.